Compact Retort Chambers
HLM series
HLM-36ELB / HLM-36EF

 ■ Installation Conditions (main items)
Power supply
Single phase AC200V 25A or more
Water supply facility
Connect the equipment to a water supply facility that has a water pressure of 0.23MPa to 0.40MPa, flow rate of 6 L / min or more.
※Check that the water pressure does not fall below the specified value when using another water supply system. If this condition is not met, a pressure pump may be required.
Drainage facility
A drain port is 3 / 8 inch female thread specification. Connect the equipment to a heat-resistant drainage facility as hot water may be discharged. (Steel pipes recommended)
Installation place
Install the equipment in a horizontal place where water does not splash. When installing the equipment, make a space of 20 cm or more on the left and right sides and the rear side. Avoid installing the equipment in a place where the room temperature becomes 5℃ or less, or 35℃ or more.
Boiler
A boiler is not used.